https://d28dhd8eubcyz4.cloudfront.net/iiif/2/curtis-production2-cache%2F1%2F5%2F8%2Fb7628a-2947-4069-96cb-d7ce5692d818%2Fresize_master_a8f371debe88a0ccd02a653f521812ec.jpg/full/!880,1024/0/default.jpg?sig=2c9d624c869ea68dfb78505b8cef3ee1f43d2913&ver=1655531494
Prime Minister Muldoon at the Mangaweka - Utiku Railway Deviation
- Description
This major engineering project took nine years to complete at a cost of $17,000,000. Pictured from left: Engine Driver Des Manaton, the PM Mr Muldoon, locomotive assistant Bryce Cameron (above) and guar Mat Pita.
Identification
- Object type
- Image
- Date
- 1981
- Digitisation ID
- 2014P_R21_007565
- Held In
- Coolstore