Found 1 result

Narrow search resultsHideFilters

 
Laying of 36" Sewer Pipes

Laying of 36" Sewer Pipes

Bill Hughes (PNBC Foreman) is standing on the left and J R Hughes (PNBC Engineer) is standing on the right. J R Hughes became Borough Engineer in 1919 and still held the post in 1937. This appears to be the Awapuni area beside the old sewage ponds.

Creator
Place
Palmerston North