Reservoir at Turitea
Samuel Jickell was Palmerston North Borough Engineer from 1904-1919. This reservoir was formed when the height of the second dam on the Turitea Stream was raised to 50 feet in 1912.
Samuel Jickell was Palmerston North Borough Engineer from 1904-1919. This reservoir was formed when the height of the second dam on the Turitea Stream was raised to 50 feet in 1912.