
Plan, Turitea Bridge (2nd Crossing)
- Description
Plan of the Turitea Bridge near Hart's Road which is the 2nd crossing of the Turitea Stream. Plan shows the elevation, plan of lower and upper booms and cross-section. Plan is Kairanga County Council Contract # 32 and drawn by J Stanley Bruce, engineer. Circa 1885.
Scale is 1 foot to 1 inch.
Identification
- Object type
- Image
- Relation
- KCC 2/16/1, Folder 9
- Date
- 1885
- Digitisation ID
- 2017P_KCC-2-16-1-F9_023294
- Format
- Paper
- Held In
- PNCC Archives