Skip to Content
"Days of Existence are Numbered" - Longburn Railway Bridge

More Info →"Days of Existence are Numbered" - Longburn Railway Bridge

This image was taken for a story that ran in The Manawatu Evening Standard on 25 June 1958, page 8: "The days of the life of the wooden structure in this photograph are numbered. The bridge is that used by railway traffic and is situated south of Longburn. A contract is to be let for the construction of a new structure."

Identification

Object type
Image
Digitisation ID
2017N_2017-20_014799
Title
"Days of Existence are Numbered" - Longburn Railway Bridge
Relation
Manawatu Standard Negative Collection
Format
B&W negative
Held In
Coolstore
Archive
Manawatū Evening Standard Negative Collection

Related items

"Days of Existence are Numbered" - Longburn Railway Bridge
Grafton Bridge, Auckland
Grafton Bridge, Auckland
Longburn Railway Station, showing turntable
Bridge over the Ohau Channel, Mourea
Whanganui Bridge
Widening of the Gorge, 1920s
Plan, Turitea Bridge (2nd Crossing)
Pohangina River Railway Bridge
Pohangina River Railway Bridge - reverse
Manawatū Gorge Road Bridge - reverse
Manawatū Gorge Road Bridge

Creation

Created By
Place
Longburn
Date
June 25, 1958

Object rights

Credit Line
Fairfax Media New Zealand

Taxonomy

Community Tags
demolish,

Report a problem

Related items

"Days of Existence are Numbered" - Longburn Railway Bridge
Grafton Bridge, Auckland
Grafton Bridge, Auckland
Longburn Railway Station, showing turntable
Bridge over the Ohau Channel, Mourea
Whanganui Bridge
Widening of the Gorge, 1920s
Plan, Turitea Bridge (2nd Crossing)
Pohangina River Railway Bridge
Pohangina River Railway Bridge - reverse
Manawatū Gorge Road Bridge - reverse
Manawatū Gorge Road Bridge

User comments