Skip to Content
Description

Samuel Jickell was Palmerston North Borough Engineer from 1904-1919. This reservoir was formed when the height of the second dam on the Turitea Stream was raised to 50 feet in 1912.

Identification

Object type
Image
Relation
Public Photograph Collection W 51
Date
1913
Digitisation ID
2014N_W51_009175
Held In
Coolstore

Related items

Raising the Barrier at Turitea Dam
Construction of Second Turitea Dam
Lower Turitea Dam
First Turitea Dam
Addition to the Lower Turitea Dam
Second Turitea Dam Opening Day
Construction of the Spillway of the Lower Turitea Dam
Second Dam at Turitea Stream, Upstream Side
Second Dam at Turitea Stream, Upstream Side
Second Turitea Dam
Second Turitea Dam
Original Turitea Dam

Taxonomy

Tags
engineering,
photographs,
pncc,
tiritea,
water,
Community Tags

Report a problem

Related items

Raising the Barrier at Turitea Dam
Construction of Second Turitea Dam
Lower Turitea Dam
First Turitea Dam
Addition to the Lower Turitea Dam
Second Turitea Dam Opening Day
Construction of the Spillway of the Lower Turitea Dam
Second Dam at Turitea Stream, Upstream Side
Second Dam at Turitea Stream, Upstream Side
Second Turitea Dam
Second Turitea Dam
Original Turitea Dam