More Info →Looking Downstream from the Turitea Dam

Samuel Jickell was Palmerston North Borough Engineer from 1904-1919. This dam was originally completed in 1907 but was raised to 50 feet in 1912. It was officially opened February 17 1913. This enlarged dam remained in use until 1957 when a 100 ft high dam was constructed.

Identification

Object type
Image
Digitisation ID
2014N_W50_009174
Title
Looking Downstream from the Turitea Dam
Relation
Public Photograph Collection W 50
Format
B&W print
Held In
Coolstore

Related items

Addition to the Lower Turitea Dam
Second Dam at Turitea Stream, Upstream Side
Looking Downstream from the Turitea Dam
Lower Turitea Dam
Reservoir at Turitea
Construction of the Spillway of the Lower Turitea Dam
Second Dam at Turitea Stream, Upstream Side
Construction of Second Dam at Turitea
First Turitea Dam
Construction of Second Turitea Dam
Raising the Barrier at Turitea Dam
First Turitea Dam

Creation

Created By
Place
Turitea, Palmerston North
Date
1913

Object rights

Credit Line
Palmerston North City Library

Taxonomy

Community Tags

Report a problem

Related items

Addition to the Lower Turitea Dam
Second Dam at Turitea Stream, Upstream Side
Looking Downstream from the Turitea Dam
Lower Turitea Dam
Reservoir at Turitea
Construction of the Spillway of the Lower Turitea Dam
Second Dam at Turitea Stream, Upstream Side
Construction of Second Dam at Turitea
First Turitea Dam
Construction of Second Turitea Dam
Raising the Barrier at Turitea Dam
First Turitea Dam

User comments